Yes. During the design process, which will occur after the bond is passed, cost estimates are reviewed at multiple phases. If adjustments are necessary, options may include: » Material selections » System features » Design details » Phasing or delaying certain non-essential elements A construction manager would work with the district throughout design to help control costs.